Home

Main inland waterway routes

Vietnam Inland Waterways Administration discuss the cooperation opportunities on information technology with South Korean Delegation
Keyword Xem với cỡ chữ

At VIWA's Office

On March 17th 2016, Mr. Hoang Hong Giang, VIWA's Director General received Korean delegation at VIWA's office. During the meeting, two parties discussed the potential, strengths and cooperation opportunities, particularly the application of information technology to manage inland waterways efficiently.

.Attending the meeting, Mr. Young-hoon Seo, Doctor of Engineering, Senior Manager of K-water assigned Head of Korean delegation, following by Kunil Engineering Company and IReX Company, who are among the biggest Korean companies on design and planning water engineering and information technology application.

During the working session, Mr. Hoang Hong Giang focused on the target of using information technology in management, operation and exploitation of inland waterway infrastructure in the short term. The Korean side expressed desire to cooperate and coordinate with VIWA for establishing the Master Plan on Inland Waterway information system in Viet Nam, moreover, South Korea wants to explore opportunities for cooperation in infrastructure improvement projects, application of information technology in vessels management, port facilities operation, as well as installation of AIS and VTS system

Following the schedule, on 18th March, Korean delegation visited some ports along Viet Tri – Ha Noi – Hai Phong inland waterway route in order to survey the handling capacities & facilities and transport operation of inland waterway ports. Two parties backed to Hanoi on the same day for discussing the plan to implement the mentioned project.

South Korean delegation activities in Viet Nam

Field trip in Viet Tri city

VIWA's data managerment system

Visiting Hai Phong port - Viet Tri City

Back
45 main Inland Waterways routes
Keyword Xem với cỡ chữ
45 MAIN INLAND WATERWAYS ROUTES  
               
No. ROUTE NAME Height Specifications Technical level Current Note
H (m) B (m) R (m)
I  WATERWAY NORTHERN ROUTES            
1 Quang Ninh - Ninh Binh route (via/across Dao river Hai Phong, Luoc river):  264 >3,2 50 >500 II  
2 Day estuary - Ninh Binh route: from Day estuary to Ninh Phuc port 72 >4,0 90 >600 I  
3 Ha Noi port - Lach Giang estuary route(Ninh Co estuary) 196 >4,0 90 >600 I  
4 Hai Phong - Ha Noi route (across Đuong river): from Hai Phong port to Ha Noi port 154.5 >3,2 50 >500 II  
5 Ha Noi - Viet Tri - Lao Cai route: from Ha Noi port to Nam Thi confluence ( Lao Cai city) 365.5          
  Ha Noi port - Viet Tri port  74 >3,2 50 >500 II  
  Viet Tri port - Yen Bai port 125 >2,8 40 >350 III  
  Yen Bai port - Nam Thi confluence (Lao Cai city) 166 >2,3 30 >150 IV  
6 Viet Tri - Hoa Binh route : from Viet Tri port to Hoa Binh Port 74 >2,8 40 >350 III  
7 Quang Ninh - Ninh Binh route (across Lach Giang estuary): from Luc estuary to Ninh Phuc port 178.5 by design by design by design special  
8 Viet Tri - Tuyen Quang - Na Hang route 186       III & IV  
  Viet Tri - Lo Gam confluence 115 >2,8 40 >350 III  
  Lo Gam confluence- Tuyen Quang hydroelectric dam downstream 71 >2,3 30 >150 IV  
9 Pha Lai - Da Phuc route: from Pha Lai port to Da Phuc port 86 >2,8 40 >350 III  
10  Pha Lai - A Lu route: from Pha Lai port to A Lu port 35 >2,8 40 >350 III  
11 Ninh Binh - Thanh Hoa route: from Ninh Phuc port to Le Mon port 129 >2,8 40 >350 III  
12 Van Gia - Ka Long ( Ka Long river) route: from Van Gia port to Ka Long (Mong Cai city) 17 >2,8 40 >350 III  
13 Hoa Binh hydroelectric lake: from Ba Cap port to Ban Ket port 203       I; II  
  Ba Cap port - Ta Hoc port 165 >4,0 90 >600 I  
  Ta Hoc port - Ban Ket port 38 >3,2 50 >500 II  
14  Son La hydroelectric lake: from Son La hydroelectric dam to Lai Chau hydroelectric downstream 175 >2,8 40 >350 III  
15 Lai Chau hydroelectric lake: from Lai Chau electric dam to upstream 64 >2,8 40 >350 III  
16 Thac Ba hydroelectric lake:  from Thac Ba hydroelectric dam to Cam Nhan; level I, about 50 km length. 50 >4,0 90 >600 I  
17 Tuyen Quang hydroelectric route : from Tuyen Quang Hydroelectric dam to upstream, level III, about 16km length 16 >2,8 40 >350 III  
II  WATERWAY  CENTRAL ROUTE            
1 Ma river route: from Lach Trao estuary to Ham Rong, level I-II, about 19,5km length. 19.5       I, II  
  Lach Trao estuary - Le Mon port 10.5 >4,0 90 >600 I  
  Le Mon port - Ham Rong 9 >3,2 50 >500 II  
2 Len river route: from Lach Sung estuary to Do Len wharf/ben 23.5 >2,8 40 >350 III  
3 Lam river route: from Hoi estuary to Do Luong, level I-II, about 108 km length. 108       I-III  
  Hoi estuary - Ben Thuy 19 >4,0 90 >600 I  
  Ben Thuy - Đo Luong:  89 >2,8 40 >350 III  
4 Nghen river route: from Sot estuary to Nghen bridge; cấp II-III, dài khoảng 34,5 km. 34.5       II,III  
  Sot estuary - Ho Đo port 14 >3,2 50 >500 II  
  Ho Đo port - Nghen bridge 20.5 >2,8 40 >350 III  
5 Gianh river route: from Gianh estuary to Đong Lao; level I-III, about 63,5 km length. 63.5       I-III  
  Gianh estuary - Gianh port 2.5 >4,0 90 >600 I  
  Gianh estuary - Len Bang 29.5 >3,2 50 >500 II  
  Len Bang - Đong Lao 33.5 >2,8 40 >350 III  
6 Nhat Le river route: from Nhat Le estuary - Long Đai bridge; level I-III, about 23.5 km length. 23       I-III  
  Nhat Le estuary - Nhat Le port 3.2 >4,0 90 >600 I  
  Nhat Le port - Long Đai bridge 19.8 >2,8 40 >350 III  
7 Hieu river - Thach Han river route: from Viet estuary to Tram dam; level III, about 50km length. 50 >2,8 40 >350 III  
8 Huong river route: from Thuan An to Tuan confluence; level III, about 34 km length. 34 >2,8 40 >350 III  
9 Hoi An - Cu Lao Cham route: Hoi An port to Bai Lang port; level I-III; about 23,5 km length. 23.5       I-III  
  Hoi An - Dai estuary , (Thu Bon river) 6.5 >2,8 40 >350 III  
  Dai estuary - Bai Lang port (Cu Lao Cham), to island route 17 >4,0 90 >600 I  
10 Song Han port - Ky Ha port, level III, about 101km length 101 >2,8 40 >350 III  
  Song Han port - Vinh Dien confluence (Han river, Vinh Dien river) 29 >2,8 40 >350 III  
  Vinh Dien confluence - Hoi An port (Thu Bon river) 14.5 >2,8 40 >350 III  
  Hoi An port - Ky Da port (Truong Giang river) 57.5 >2,8 40 >350 III  
               
III WATERWAY SOUTHERN ROUTE            
1 Tieu estuary - Cambodia border route: from Tieu estuary to Thuong Phuoc border crossing (Dong Thap); Special level, bout 218 km length 218 by design by design by design special demension in the brackets means route is a channel
2  Dinh An estuary - Campuchia border route; special level and level I, about 211 km length. 211       special & level I demension in the brackets means route is a channel
  Dinh An estuary - Tan Chau confluence (An Giang) 184 by design by design by design special demension in the brackets means route is a channel
  Tan Chau confluence - Cambodia border 27 >4,0 (4,5) 90 (75) >600 I demension in the brackets means route is a channel
3 Sai Gon - Ca Mau  route (Xa No chanel) : from Te chanel confluence (Sai Gon river junction) to Ca Mau port,  level III; about 336 km length. 336 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
4 Vung Tau - Thi Vai - Sai Gon - My Tho - Can Tho route: from Ben Dinh port (Vung Tau city) to Can Tho port; special level and level II, about 242.5 km length. 242.5 >3,2 (3,5) 50 (40) >500 II demension in the brackets means route is a channel
  Vung  Tau - Thi Vai 28.5 by design by design by design special level demension in the brackets means route is a channel
  Thi Vai - Sai Gon ( including local viver) 65 >3,2 (3,5) 50 (40) >500 II demension in the brackets means route is a channel
  Sai Gon - My Tho 38.5 >3,2 (3,5) 50 (40) >500 II demension in the brackets means route is a channel
  My Tho - Can Tho ( Mang Thit river) 110.5 >3,2 (3,5) 50 (40) >500 II demension in the brackets means route is a channel
5 Sai Gon - Kien Luong (Lap Vo channel) route: from Te channel confluence - Kien Luong - Ha Tien; level III, about 320 km length. 320 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
6 Sai Gon - Ca Mau coastal route; level III, about 367 km length 367 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
  Sai Gon - Dai Ngai: Te channel confluence  - Dai Ngai port 179 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
  Dai Ngai- Ca Mau: from Dai Ngai port to Ca Mau port 188 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
7 Sai Gon - Ben Suc (Sai Gon river) route: from Te channel confluence to Ben Suc port (Binh Duong); level III,  about 90km length. 90 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
8 Sai Gon - Ben Keo (Vam Co Dong river) route: from Te confluent channel to Ben Keo port; level III, about 142.9 km length. 142.9 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
9 Sai Gon - Moc Hoa (Vam Co Tay river): from Te channel  confluence to Moc Hoa port; levelIII; about 143.4 km length. 143.4 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
10 Sai Gon - Kien Luong route (Thap Muoi No.1 channel): from Te channel confluence to Ba Hon (Kien Luong town); level III, about 288km length. 288 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
11 Moc hoa - Ha Tien route: from Moc Hoa port to Ha Tien reservoir; level III, about 214 km length. 214 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
12 Sai Gon - Hieu Liem (Dong Nai river) route: Te channel confluence to Hieu Lien (Dong Nai); level III; about 90km length. 90 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
13 28 Channel - Phuoc Xuyen channel route: from Cai Be town to Sa Rai town (Tan Hong, Dong Thap); level III; about 76 km length. 76 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
14 Rach Gia - Ca Mau route:  from Tac Cau port to Ca Mau port; level III; about 109km length. 109 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
15 Sai Gon - Ha Tien route (Thap Muoi No. 2 channel): from Te channel confluentce - Ton Tri Hau Giang channel - Tam Ngan channel (No.1) - Ha Tien resevoir; level III, about 277.6 km length. 277.6 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
16 Can Tho - Ca Mau ( Quan Lo - Phung Hiep channel) route: Can Tho port to Ca Mau port; level III, about 102 km length. 102 >2,8 (3,0) 40 (30) >350 III demension in the brackets means route is a channel
17 Ham Luong river route: from Tien river confuence to Ham Luong estuary; special level; about 90 km length. 90 by design by design by design special demension in the brackets means route is a channel
18 Co Chien river route: from Co Chien to Tien river confluence; level I - special level; about 109 km length. 109       special & level I demension in the brackets means route is a channel
  Co Chien estuary - Cha Vinh channel confluence. 46 >4,0 (4,5) 90 (75) >600 I demension in the brackets means route is a channel
  Tra Vinh Channel confluence - Co Chien confluence 63 by design by design by design special  demension in the brackets means route is a channel
Back